1. THTR Circular No. 112 April 07

    the delivery of assembly equipment. The one-year assembly work is scheduled to begin in September 2007 and will be carried out together with local Argentine assembly personnel. From now on, the technical processing and planning will be carried out at the Dortmund location/works and from April/May all the necessary project-specific welding qualifications will be carried out at the Atucha construction site." From...

  2. THTR Newsletter No. 111 March 07

    only one thing left: save, save, save. What will security look like in 20 or 50 years if this continues? URENCO Gate in NRW! Top of page URENCO, with its locations in Gronau, Almelo and Capenhurst, has now come into the public eye not only because it produces the nuclear fuel for dozens of nuclear power plants in Europe, transports nuclear waste to...

  3. THTR Newsletter No. 76 September 02

    climbed the walls of South Africa's only nuclear power plant in Koeberg, 30 km north of Cape Town, and attached a banner with the following text: "Nukes Out Of Afrika". This Koeberg location is also intended for the planned PBMR. With this campaign, Greenpeace wanted to draw public attention to the danger of this reactor line and called on politicians...

  4. THTR Circular No. 82 April 03

    have been difficult. Nuclear weapons accessories from Hamm: Arrests at Montanhydraulik Top of page In THTR newsletters 72 and 79 we reported on the company Montanhydraulik, which also has a location in Hamm with 100 employees. She is said to be involved in illegal arms exports to India. When we asked, the public prosecutor's office did not provide any information after a year and a half and referred to...

  5. THTR Newsletter No. 85 September 03

    Gauteng (Johannesburg) and the North West (Pelindaba) which were considered for the construction of the test reactor. The demonstration reactor will be located in Cape Town. Durban is earmarked as a location for the import of enriched uranium. Gauteng, on the north-western border, is being used as a construction site for the fuel reprocessing plant being developed by the Nuclear Energy Corporation of South...

  6. THTR Circular No. 87 January 04

    should. The objections to the planned reactor were well received and the Cape Town city council is fully behind them. In addition to the enormous costs of risk prevention, the disadvantage of the location plays a major role in the event of damage: Cape Town and the surrounding area, along with Krueger Park, are the country's main tourism magnet. Apparently even the South African federal government wants to get out...

  7. THTR Newsletter No. 89 March 04

    the associated transport of nuclear waste and the establishment of a round table - the city of Hamm has an immense wealth of experience in connection with the concrete consequences of the location of a nuclear pilot project. In this context, it should not be forgotten that the future of the THTR ruins has not yet been finally clarified - and what contribution the city of Hamm...

  8. THTR Circular No. 90 June 04

    the HTR line and the new construction of these reactors in Germany. I think the city of Hamm cannot run away from its own past. It should face the fact that it was and still is the location of a highly controversial, trouble-prone reactor line worldwide. In the future it should be self-evident that information about experiences with this reactor...

  9. THTR Circular No. 97 February 05

    which (...) profoundly reshaped our society"5. However, the BBU was not the only umbrella organization of citizens' initiatives. In the course of the violent disputes at the respective locations of planned nuclear power plants, a whole series of local or regional associations of very different character emerged .The various parties and...

  10. THTR Newsletter No. 98 March 05

    currently 1800 to 4500 tons of uranium separation work per year. The Greens were shocked to learn of the approval from the newspaper, writes Rüdiger Bartels to the party leadership. And: It is clear that the Gronau location is massively driving forward the expansion of the nuclear industry in Germany and the world. Bartels and the dozen or so colleagues in Gronau are holding the approval...

  11. THTR Newsletter No. 99 April / May 05

    with heat and hot water and can also be used as a training reactor". And in issue 18/1989 this newspaper reported: "The next step is now a concept and location approval". - Of which nothing came of at first. With participation in the CRP conferences, Turkey has again been directly connected to the discussions of the international...

  12. THTR Newsletter No. 78 December 2002

    The light blue tiled toilet facility on Martin-Luther-Strasse shows the careless to embarrassing treatment of traces of Jewish life in Hamm. In the shadow of the former urinal is the location of the Jewish Synagogue, built in 1868 according to a design by I. Lehnhartz in the backyard at Kleine Werlstrasse 5, in 1938 at the instigation of the Nazi regents in the city of Hamm at the expense of the Jewish...

  13. THTR Circular No. 108 August 06

    Top of page Right on the first day of the holiday, NRW Research Minister Pinkwart pursued his favorite activity - filling the summer slump with a highly innovative idea: NRW should once again become the location of a new THTR. "Why not?" he asked, seemingly astonished, in the interview. Almost all newspapers reported on his second attempt on the matter within a few months. The...

  14. THTR Circular No. 107 June 06

    The RWE press release of May 18.05.2006, 4,8 states the following about Advent: "Advent international is one of the world's leading equity companies with assets under management of 14 billion euros and locations in 1984 countries in Western and Central Europe, North America and Latin America and the Asia-Pacific region. Since its founding in 500, Advent has invested in more than XNUMX companies and...

  15. THTR Newsletter No. 103 December 2005

    in the new building offensive. Consortia of manufacturing companies and power producers are preparing new construction and operating permits. GE Energy and Westinghouse have already made a preselection of six locations and want to share the half-billion-dollar cost of the preparatory work with the Department of Energy. The magazine atomwirtschaft (atw 8/9, 2005) reported...

  16. Reactor failure THTR - communication

    such as those in Jülich and Hamm as well as the former uranium mining sites in the Ore Mountains, producing plants such as the interim storage facility in Ahaus, Urenco in Gronau and the GKSS locations... and much more. Addendum - There are now some 'studies on radioactivity'. * - How can one propagate the 'War on Terror' on the one hand and, on the other hand, spread it worldwide...

Results 141 - 156 from 156