Assuming that "gigawatts“ is needed and "factory“ is needed, the following result was found.
the limited shipping capacity and physical problems with regasification in Germany or the lack of connectivity in Europe... * Renewable | Energy transition | Gigawatt Factory Lausitz is to become a green power plant Wind farms, PV, storage and hydrogen: Leag wants to use post-mining areas for the energy transition by 2030. The plan is huge: Lusatia...